Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

98 articles tagged #HEPAULPA.

21 CFR 211.42 and 211.46 and EU GMP Chapter 3 ask for adequate ventilation, air control and filtration, but give no air change rate or pressure differential, and no filter class beyond HEPA for aseptic areas. Those come from Annex 1, FDA's 2004 aseptic guidance, ISO 14644 and the designer's justification, recorded in the design basis.

InsightRead

ISO Class 1 vs ISO 5: counting at 0.1 µm

ISO Class 1 allows 10 particles of 0.1 µm and larger per cubic metre; ISO 5 allows 100,000 at that size. At that level the installed leak scan must prove frames and grid, not just the U15 filter, single-digit counts need large sample volumes, and airborne molecular contamination needs its own sampling plan.

InsightRead

Both states are required; only the stage is a choice

A 50 m² Grade B room needs 10 classification locations under ISO 14644-1:2015, and EU GMP Annex 1 requires them at rest against ISO 5 and in operation against ISO 7, with the smoke study in both states. Whether each run sits in OQ or PQ is for the URS and risk assessment to justify.

InsightRead

Charged media: new efficiency vs discharged efficiency

Electrostatically charged filter media lose efficiency as the charge drains in service, while pressure drop barely changes. EN 779:2012 added a discharged minimum for F7 to F9; ISO 16890 rates ePM as the average of initial and discharged efficiency. Buy pre-filters on that rating.

InsightRead

EU GMP Annex 1 expects the final stage of an airlock to be, at rest, the same grade as the cleanroom it leads into. Into Grade B, that means 3,520 particles of 0.5 µm per m³, terminal HEPA supply, its own pressure step and a place in environmental monitoring, not a transfer grille.

InsightRead

ISO 16890 rates filters as ePM10, ePM2.5 or ePM1, and broadly a filter must remove at least 50% of that particle fraction to earn the group. In a GMP air handling unit the pre-filter grade sets how fast the terminal HEPA loads, and so how often it is replaced and leak-tested.

InsightRead

Seven HVAC documents, indexed before the inspection

Cleanroom inspectors ask for the same HVAC evidence: qualification report, pressure trends and alarm log, HEPA leak tests, classification and recovery, smoke studies, as-builts and change controls. Index them per room, with document number, revision and location, so the back room answers in minutes.

InsightRead