Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

98 articles tagged #HEPAULPA.

Diffuser type and mixing in a Grade C room

At 20 air changes an hour, ideal mixing gives a 100:1 recovery time of about 14 minutes; a poorly mixed corner acting like 10 ACH takes about 28. Swirl diffusers come closest to ideal, perforated faces mix less, and plain HEPA faces suit a critical bench. Place the recovery probe where air arrives last.

InsightRead

AMC limits: name the compound, then the unit

HEPA and ULPA filters do not stop airborne molecular contamination, and an AMC limit written only as "1 ppb" is a different mass for every compound: about 0.70 µg/m³ for ammonia, 1.49 µg/m³ for hydrogen chloride. A fab URS should name the compound, the unit with its reference temperature, and the sampling method.

InsightRead

Pass boxes: where the grade boundary leaks

A pass box sits across a grade boundary designed for at least 10 Pa. The interlock does not fix a worn door seal, a static box is made safe by the disinfectant contact time rather than by waiting, and a dynamic box needs its supply balanced against both rooms and its HEPA filter leak tested.

InsightRead

Grade A is judged in operation

Grade A must meet ISO 5, 3,520 particles of 0.5 µm or larger per cubic metre, both at rest and in operation. An FFU array is therefore judged with operators and machines in the zone: uniform unidirectional flow, leak-tested H14 filters and a smoke study run with the real interventions.

InsightRead

ULPA U15 to U17: where the extra nines pay

EN 1822 ULPA classes add a nine each above H14: U15 99.9995%, U16 99.99995%, U17 99.999995% at MPPS. Semiconductor ISO Class 1 to 3 spaces need them. A pharma Grade A zone at ISO 5 rarely does, because people and seal leaks drive its counts; H14 with a sound seal usually carries it.

InsightRead

Manufacturing & Distribution

H14 at 99.995%: only as good as its seal

An H14 filter passes 0.005% at MPPS in its factory test, H13 0.05%. A frame or gasket leak passing 0.05% of the airflow equals the whole H13 penetration, cancelling the upgrade. The installed leak test, scanning the filter face and perimeter seal, is where the real performance is proven.

InsightRead

Balancing from the ceiling void means lifting panels over a clean room. Specify terminal HEPA boxes with a damper adjustable through the diffuser, a lock, an upstream aerosol port for the leak test, a pressure tapping and a seal the damper does not disturb, so the cascade is set with the ceiling shut.

InsightRead