Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

85 articles tagged #Annex1.

As-built classification on a new cleanroom suite

ISO 14644-1 allows a room to be classified as-built: installation complete, services running, no equipment, materials or people. On a new suite it shows whether the HVAC, filters and envelope can reach the class alone. It says nothing about machines or people, so the GMP classification is still done at rest and in operation.

InsightRead

10–15 Pa for FDA, 10 Pa for Annex 1: one cascade

FDA's 2004 aseptic guidance asks for at least 10–15 Pa between rooms of different classification; Annex 1 gives at least 10 Pa as guidance. Setting each cascade step at 15 Pa meets both. Holding it is harder: seals wear and filters load, so trend the differentials instead of waiting for alarms.

InsightRead

A one-page-per-risk CCS storyboard

A contamination control strategy spread across dozens of documents is hard to present in one inspection day. A storyboard with one page per risk, carrying design controls, SOP references, monitoring trends, the owner and open CAPAs, gives the team a way to walk an inspector through it without rewriting the strategy.

InsightRead

Annex 1 (2022) expects an aseptic process simulation to imitate routine processing with worst-case conditions. An APS run right after a filter change and rebalance tests a different process. Schedule maintenance away from APS runs and record the HVAC state for each run like the interventions.

InsightRead

Testing unidirectional and mixed airflow

Mixing air lowers the average particle count but cannot sweep a particle off an open vial. Unidirectional airflow is checked by air speed, with an Annex 1 guidance range of 0.36–0.54 m/s, and a filmed smoke study; a mixed-flow room by its 100:1 recovery time (ISO 14644-3).

InsightRead