"Quality is QA's job" is not how the GMP texts read. The 2013 text of EU GMP Chapter 1 makes the quality objective the responsibility of senior management, with staff in many departments taking part. Chapter 2 lists qualification and maintenance of premises and equipment among the duties the heads of Production and Quality Control generally have.
Cleaning validation is often reduced to showing the previous product is gone. EU GMP Annex 15 (2015) also says limits should be established for cleaning agents, microbial and endotoxin risk should be considered when protocols are developed, and the times before and after cleaning should be used to define dirty and clean hold times.
A chilled water coil piped in parallel flow still cools, so the error often survives commissioning. It shows as a valve at 100%, return water colder than design and an off-coil temperature that misses setpoint. Mark inlet and outlet at the factory, check at FAT, and look again before the insulation goes on.
An ISO 9001 certificate shows that a supplier's quality management system was audited within a stated scope. It does not show that the equipment or service you bought meets your requirement. Supplier qualification assesses what you buy, against your URS, to a depth set by risk: questionnaire, audit or factory hold points.
A work order closed with ticks holds no data. Rewrite each 'check' as a named measurement with its acceptable range and the action to take outside it, and record the as-found value before any adjustment. Start with the assets the criticality assessment ranks highest. The as-found figures become the trend.
Continued process verification is the FDA's Stage 3: assurance during routine production that the process remains in a state of control. EU GMP Annex 15 (2015) calls it ongoing process verification. Continuous process verification, defined in ICH Q8(R2), is an alternative approach to validation. Write the phrase out and cite its source.
For biotech products, the CTD appendix on facilities and equipment in ICH M4Q(R1) asks for a diagram of the manufacturing flow, information on adjacent areas and other products, a summary of product-contact equipment, and the procedures and design features that prevent contamination. Each is a design decision that becomes a regulatory statement.
A registration batch, also called an exhibit or primary batch, is made to generate the data filed for registration. ICH Q1A(R2), the stability guideline, asks for data on at least three primary batches made by a process that simulates production. Their data underpins the shelf life, so make them on qualified equipment.
A standby generator run with no load each month proves that it starts. NFPA 110 sets the monthly exercise for diesel sets at a minimum of 30 minutes, at not less than 30% of nameplate kW or at the exhaust temperature the manufacturer recommends. Record load, time and temperatures at every run.
Dropping the trial batch makes the first batch a receiving site ever produces the one whose stability data goes into the dossier. ICH Q1A(R2) (2003) says the process used for primary stability batches should simulate the production process. Our advice is to run a trial batch first, compare it with the sending unit's data and fix what it shows.
The Manufacture section of CTD Module 3 is written from what the site knows: the manufacturers and their responsibilities, the batch formula, the process description with equipment type and capacity, the controls of critical steps and the process validation. Regional requirements differ; the site's job is inputs that agree with each other.
A Cpk of 1.33 puts the nearer specification limit 4 standard deviations from the process mean. It is a statistical convention: EU GMP Annex 15 (2015 text) and the FDA guidance of 2011 recommend statistical tools and name no index. With 10 batches the confidence interval is wide, so report the batch count and the interval.