Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Manufacturing & Distribution

Manufacturing & Distribution

117 articles filed under Manufacturing & Distribution.

EC fan walls: the earth leakage figure your RCD needs

Each EC fan's EMC filter leaks current to earth in normal running, and a fan wall adds it up. At an assumed 3.5 mA per fan, eight fans put 28 mA on earth, while a 30 mA RCD may trip from 15 mA. Split circuits, choose the right RCD type and size the earth.

InsightRead

The installed HEPA scan covers media, frame and the filter-to-housing seal, but not the flange between housing and ceiling. Where the ceiling void runs at higher pressure than the room, unfiltered air enters there. Seal it with an evenly compressed gasket and sealant bead, then probe the flange and file the result.

InsightRead

Panel labels that match the drawing

When a terminal label disagrees with the drawing, fault-finding turns into guessing. At FAT, trace ten random wires end to end, read device tags against the drawing and bill of materials, and confirm the door-pocket drawing carries the same revision as the equipment file. After site changes, return marked-up drawings.

InsightRead