Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

190 articles tagged #AirHandlingUnits.

Trace the EMS supply from sensor to historian

A particle counter on UPS can stay powered through a power dip and count nothing if its vacuum pump sits on the normal supply. Network switches in risers, transmitters on AHU field panels and unsynchronised clocks leave the same kind of gap. Trace the supply of every item between the sensor and the historian.

InsightRead

Clean AHU cooling coils from the leaving face with low-pressure water or steam and an approved, fully rinsed detergent, after checking the drain. Take the frequency from the coil's pressure drop trend against a commissioning baseline, and record the method, detergent batch, before and after readings and photos of both faces.

InsightRead