Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

137 articles tagged #Cleanroom.

Raised-floor panels and downflow in a fab bay

Air through a 25% open floor panel moves 4 times faster than the downflow above it, and that pressure drop keeps a fab bay's airflow vertical. Use less open area near return chases, solid panels under tools with rebalancing around them, sealed cut-outs, and check with a smoke study after tool install.

InsightRead

Three APS runs across all shifts, and the HVAC has to hold still

Annex 1 initial validation of an aseptic process needs at least 3 consecutive successful simulations covering all working shifts, then periodic runs twice a year per process, line and shift. The cleanroom must hold its qualified state throughout. Agree an HVAC freeze date with QA, and list in advance which jobs are like-for-like and which need an impact assessment.

InsightRead

Why qualified rooms stay constant volume

A classified room's air change rate, recovery time and pressure steps were proved at one airflow. Constant volume holds each room's flow at that value with a terminal, while the fan speeds up as filters load. VAV moves supply with the cooling load, so it belongs in offices, technical areas and fume-hood exhaust.

InsightRead

Air showers: where they help and where they are over-sold

An air shower blows loose fibres off the outside of a coverall and interlocks two doors. It does nothing about what operators shed from underneath. It earns its place at powder-area entries and interlocked routes, and it should never be the reason a gowning step disappears from the procedure.

InsightRead

A timed airflow setback is simple to validate but blind to off-schedule activity. Particle-count-driven airflow follows real use and can save more, but counters and their failure modes join the validated system. Either way, the room must recover to its at-rest limits, pressures stable, before operations restart.

InsightRead

The scope of EU GMP Annex 1 (2022) says some of its principles, including the contamination control strategy, may be used for certain non-sterile products such as liquids, creams and ointments. A semi-solids plant that writes a CCS tying room grades, flows, water and monitoring to product risk has an answer for the inspector.

InsightRead