Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

379 articles filed under Life Sciences.

Transport verification lives in Annex 15

EU GMP Annex 15 asks for transport of finished products, investigational products and samples to be verified per route, seasons included. The plan is usually sound; the gap is the logger nobody checks before release. Name one role that downloads each logger on time, checks it against limits and can hold the stock.

InsightRead

Plug fan or belt drive in a GMP supply AHU

A V-belt sheds rubber dust into the airstream for its whole life, and in a GMP supply AHU that dust loads the final filters. Belt drives also lose a few per cent of shaft power and need regular tensioning. Direct-drive plug fans avoid all three, though a large belt-driven housed fan can still win at high pressure.

InsightRead

A common GDP layout places a 2–8 °C cold room inside a 15–25 °C store and backs up only the cold room. In Viet Nam the ambient zone also runs on active cooling and drifts toward outdoor temperature if it stops, so it needs a second cooling unit, standby power and an alarm with a set response.

InsightRead

GAMP 5 Second Edition puts critical thinking first

GAMP 5 Second Edition (2022) scales validation effort to risk to patient safety, product quality and data integrity, and adds agile and cloud guidance. On a GMP BMS, test alarms, audit trail and data transfer deeply. A quick check: count low-risk functions that still carry full test scripts.

InsightRead

ALCOA+ on a paper pressure log

A paper room-pressure log with every reading in the same pen at the end of the shift fails ALCOA+ before any number is checked. Walking one sheet against the nine attributes, from attributable initials to enduring ink, shows that most data-integrity failures are fixed by redesigning the form.

InsightRead

Portable HEPA units: clean air rate over room volume

Divide a portable HEPA unit's clean-air delivery rate by the room volume: 300 m³/h in a 60 m³ room is 5 equivalent air changes an hour, at the rated speed. Ask for CADR at the night-time setting, place the unit so air crosses the patient's zone, and remember it neither pressurises the room nor replaces filtered supply.

InsightRead

Fixed-speed FFUs slow down as their HEPA loads

A fixed-speed fan filter unit loses airflow as its HEPA filter loads. Set at 0.45 m/s, it has 20% to lose before the 0.36 m/s bottom of the Annex 1 guidance range. Constant-airflow EC units hold velocity if they are selected at the final pressure drop, and their speed trend doubles as a filter-loading record.

InsightRead

E-signatures: the second signing is the test

21 CFR 11.200(a)(1) requires two distinct identification components for non-biometric signatures. Later signings in one continuous session must still use a component only the signer can execute, usually the password. Define the session and its timeout in writing, then test both cases at OQ.

InsightRead

A HEPA canopy protects the wound only where its air reaches it. A canopy sized to the table leaves trolleys outside the column, and a flat lamp head leaves a recirculating wake over the incision. A smoke study with lamps, trolleys and staff in position shows both.

InsightRead