Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

209 articles filed under News.

Mapping protocols from temperate countries ask for summer and winter studies. In southern Viet Nam the real extremes are the hot dry months, which test temperature, and the rainy season, which tests humidity and latent cooling load. Two mappings timed to the local calendar give an inspector a record worth reading.

InsightRead

H14 has two limits, and the second one catches pinholes

EN 1822 gives H14 an integral efficiency of 99.995% and a local efficiency of 99.975% at any single point. A pinhole can hide inside a good average, so every H13 and H14 filter is individually leak-tested at the factory. Ask for the individual report, then leak-test the installed housing on site.

InsightRead

Before the supply fan is selected, check whether the coil sheet quotes a wet or a dry air pressure drop, and read it with the entering condition: dry- and wet-bulb at the peak dew point case. Then check leaving dew point against room RH, face velocity below about 2.5 m/s and a realistic chilled-water ΔT.

InsightRead

"3 bar" pure steam: gauge or absolute

Pure steam at 3 bar(g) saturates near 144 °C; at 3 bar(a), near 134 °C. A 134 °C sterilizer cycle needs about 3.04 bar absolute in the chamber, so a generator quoted at 3 bar absolute cannot reach it. Write the gauge or absolute suffix on every utility pressure.

InsightRead