Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

98 articles tagged #HEPAULPA.

An SOP register answers the change-control question

An SOP register should record, for each SOP, the owner, version, review date and every document it refers to. Humiley's template covers 536 SOPs across 20 departments. The cross-reference column tells a change control which documents a revision touches, and review dates keep superseded versions out of use.

InsightRead

Either way an FFU filter is changed, the room stops for the room-side leak scan, cleaning and recovery. Top-side replacement needs a walkable ceiling and disturbs the plenum; room-side replacement brings the loaded filter out through the classified space. Both need upstream injection and sampling ports that can be reached.

InsightRead

Four maintenance KPIs for a GMP plant

A single PM compliance percentage hides the overdue task QA cares about. Track PM compliance by criticality, overdue critical tasks listed by name, repeat failures on the same asset, and mean time to restore the pressure cascade from the BMS trend. All four need a CMMS asset register with criticality assessed.

InsightRead

ISO 29463 labels encode efficiency: ISO 35H is at least 99.95% and ISO 45H at least 99.995%, the integral efficiencies of EN 1822 H13 and H14. ISO 40H sits between them with no EN 1822 name and passes twice as many particles at MPPS as 45H. Name the accepted equivalent in the specification.

InsightRead