Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

379 articles filed under Life Sciences.

Batch records and the room data behind them

Under EU GMP Chapter 4, paragraph 4.11, a product with a 5-year shelf life keeps its batch documentation for at least 6 years. Environmental and BMS data that supported release is safest kept for the same period, so historian retention and storage belong in the URS for the BMS and EMS.

InsightRead

Seven HVAC documents, indexed before the inspection

Cleanroom inspectors ask for the same HVAC evidence: qualification report, pressure trends and alarm log, HEPA leak tests, classification and recovery, smoke studies, as-builts and change controls. Index them per room, with document number, revision and location, so the back room answers in minutes.

InsightRead

Diffuser type and mixing in a Grade C room

At 20 air changes an hour, ideal mixing gives a 100:1 recovery time of about 14 minutes; a poorly mixed corner acting like 10 ACH takes about 28. Swirl diffusers come closest to ideal, perforated faces mix less, and plain HEPA faces suit a critical bench. Place the recovery probe where air arrives last.

InsightRead

Barrier glove integrity: checks, tests, failures

Isolator and RABS gloves need a visual check at every use and a physical integrity test, usually pressure decay, at defined frequencies. A pinhole passes the first and fails the second. Write in advance what a failed glove triggers: which batches are assessed, which records are pulled, who decides and when the glove is replaced.

InsightRead

Vibration on AHU fans: route or online sensors

Monthly route-based vibration surveys catch slow fan faults such as imbalance, misalignment and bearing wear at a low cost per point. Permanent online sensors catch faults that develop between visits. Put sensors on fans whose stop takes a Grade A or B room out of spec with no standby, and route the rest.

InsightRead

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead

Zero growth and the HVAC record around a media fill

Annex 1 sets zero growth as the APS target, and any contaminated unit fails it. The environmental side of the investigation starts from viable monitoring, with HVAC and EMS trends as support, so review trends before the fill, confirm logging and clock sync, and agree which HVAC events count as interruptions.

InsightRead

Pass boxes: where the grade boundary leaks

A pass box sits across a grade boundary designed for at least 10 Pa. The interlock does not fix a worn door seal, a static box is made safe by the disinfectant contact time rather than by waiting, and a dynamic box needs its supply balanced against both rooms and its HEPA filter leak tested.

InsightRead

EU GMP Annex 11 clause 3.2 makes supplier competence and reliability part of computerized system validation, with the need for an audit set by risk. For SCADA, BMS and EMS, supplier records can reduce the testing the user repeats; the URS, risk assessment and configuration tests such as alarm limits and user roles stay with the user.

InsightRead

EU GMP Chapter 4 expects logbooks for major or critical equipment, recording use, calibration, maintenance, cleaning and repairs with dates and names. For an AHU serving graded rooms that means qualification events, sensor calibration, filter changes with differential pressure, repairs with deviation numbers and cleaning records.

InsightRead