Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

128 articles tagged #HumidityControl.

Checks that make a URS line testable

A URS line such as 'the HVAC system shall maintain suitable conditions' cannot be tested. EU GMP Annex 15 (2015) says the URS should be a point of reference throughout the validation life cycle. Five checks make a line usable: one requirement, a unique ID, a number with unit and tolerance, the state, and a named test.

InsightRead

An action alarm set at the specification limit leaves no margin for the sensor's uncertainty, so the room may already be outside when it rings. Borrow the guard band from calibration practice: with a 60% RH limit and ±2% RH uncertainty, set the action alarm at 58%, add an alert before it, and record the reasoning with the calibration data.

InsightRead

ISO 14644-3 is a menu of tests, and someone has to order

ISO 14644-3 lists eleven supporting cleanroom tests and gives a method for each, from air pressure difference to segregation. It says they may not all be required and that tests should be selected in a manner agreed between customer and supplier. The test specification has to name the tests, the occupancy state and the acceptance criterion before the work is priced.

InsightRead

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

Receiving HEPA filters: what to check before fitting

A HEPA filter leaves the factory tested, then travels by container, forklift and scaffold. Check the cartons on arrival, match label class, serial number and rated airflow to the schedule and test report, store dry within the stacking mark, open only at a clean work area and inspect media and gasket under strong light before fitting.

InsightRead