Skip to content
Careers at Humiley

Join us

Careers

Engineering, project-management and site roles at Humiley Group INC, on live pharmaceutical manufacturing projects in Viet Nam, Southeast Asia and the US.

  • 5 open roles
  • Viet Nam

Open positions

Build regulated facilities with us

Every role below sits on a live pharmaceutical manufacturing project. Apply by email to careers@humiley.com with your CV attached.

Working at Humiley

Engineers who ask why

We hire engineers who want to know why a thing is built the way it is, not only how to draw it.

Most of our work is on facilities where a mistake is expensive and slow to surface. That shapes who does well here. The engineers who thrive are the ones who ask what happens when this fails, who write down the reason for a decision at the time they make it, and who are comfortable saying they are not sure — because on a GMP or semiconductor project, a confident guess costs far more than an honest question.

Teams are deliberately mixed rather than siloed. Mechanical, electrical, ELV, automation and process engineers sit together, because a pressure cascade, an interlock, a cable route and a duct run are one problem seen from four sides. New engineers work alongside people who have made the calls before, on live projects rather than on training exercises.

The work is split between the design office and site. Both matter, and we would rather people spend time in both: a designer who has never watched their detail being installed keeps drawing details that cannot be installed.

Disciplines

Where our engineers work

The disciplines we hire into, and what the work involves day to day.

HVAC and cleanroom engineering

Load and psychrometric calculation, airflow and pressure design, plant selection and classification strategy for GMP and high-technology environments.

Electrical and power

LV to MV distribution up to 22 kV, load schedules, protection, standby and UPS provision, and site supervision through to energization.

ELV and networks

Access control, CCTV, public address and structured cabling, coordinated with the MEP and cleanroom disciplines rather than added afterwards.

Automation and validated systems

Control philosophy, SCADA and EBR, GAMP 5 categorization and computer system validation to 21 CFR Part 11 and Annex 11.

Project management and controls

Scheduling, earned value, procurement, risk and document control across the stage-gate program.

Site and commissioning

Installation supervision, inspection and test plans, commissioning, FAT and SAT, and qualification support alongside client quality teams.

Life at Humiley

How our people learn and grow

What each role does, how we train new engineers, and how we review their progress.

  • PADR: how we measure engineer development

    Every Humiley engineer has a Performance Appraisal Development Review twice a year, built on their skills matrix and Individual Improvement Plan. It records which competencies moved, the work that shows it and the plan for the next six months, so progression from junior to senior to lead has evidence behind it.

    Read

  • Skills matrix, IP and PADR: how graduates grow at Humiley

    One line on a graduate HVAC engineer's skills matrix might ask for an AHU's cooling and reheat plotted on a psychrometric chart and checked against the room's RH limit. At Humiley every engineer has a skills matrix and an Individual Improvement Plan, and PADR reviews run twice a year.

    Read

  • What a quantity surveyor does on a GMP project

    A cleanroom panel package can be 90% installed and 0% ready for qualification. On a GMP project the quantity surveyor measures from drawings and BIM, keeps the cost plan and prices variations, and earned value needs a second measure, rooms handed over to qualification, to show a shortfall in time.

    Read

  • Inside the role: the project administrator

    On a PMC pharma project the project administrator keeps the document register: revision, reviewer, due date and status code for every drawing and submittal. Most of the work is checking what arrives against it: an unclouded revision, a Rev C drawing sent after Rev D was issued, comments that never reached the fabricator.

    Read

  • Inside the role: cleanroom HVAC design engineer

    Cleanroom HVAC design means load calculations where moisture often outweighs heat, pressure cascades typically 10–15 Pa between grades, coils sized for wet-season dew points, BIM coordination and a paper trail for every airflow. Humiley trains graduates through a skills matrix and a 12-month internship program.

    Read

  • An improvement plan that fits on one page

    An improvement plan with twelve goals rarely gets read twice. One page works: two or three gaps your next job will test, a senior engineer marking up the real calculation, and the marked-up copy brought to the review. Every Humiley engineer has a skills matrix, an IP and a PADR twice a year.

    Read

  • Mentoring happens on the punch list

    A contractor ticks 'ceiling penetration sealed'; the lead lifts the next tile and finds the gap behind the cable tray. Weeks later that room is pressure-tested before qualification. Humiley's engineers start with a 12-month structured internship and learn the rest from senior leads on site.

    Read

  • Hiring: HVAC and electrical engineers

    Four 4 kW EC fans draw about 27.2 A, and the harmonic study for that fan wall ends at one 25 A active filter module. Humiley is hiring HVAC and electrical engineers in Ho Chi Minh City for work like this, starting from fundamentals and moving to live projects.

    Read

  • Junior, senior, lead: how each step is written down

    A junior's first GMP duct layout usually comes back covered in red, and few of the marks are about drafting. Every Humiley engineer has a skills matrix and an Individual Improvement Plan, reviewed through PADR twice a year, on a path from junior to senior to lead, with training in GMP, validation and project management.

    Read

  • Why our engineering internship runs 12 months

    A fan duty written into a load calculation is only tested at FAT months later, where a missed filter stage shows up as a fan short of its duty. A short placement sees only the calculation. Humiley's internship runs 12 months and took 20+ interns in its first year.

    Read

  • Tony Nguyen on the question he asks first-year engineers

    Humiley CEO Tony Nguyen asks junior engineers where a number on the drawing came from. A 2,400 m³/h airflow should trace to a 120 m³ room, 20 air changes an hour, the project design basis and the URS recovery time. "I'll find out" beats a confident guess.

    Read

  • We're hiring: civil/structural, QS and project administration

    Move a floor drain by a metre on a GMP project and three roles meet: the structural engineer checks the slab penetration, the quantity surveyor prices the variation, the project administrator issues the transmittal. Humiley is recruiting civil/structural engineers, quantity surveyors and project administrators in Ho Chi Minh City.

    Read

  • The wet-season coil and how we train engineers

    A fresh-air coil selected for a hot afternoon instead of the wet-season design case shows up as a humidity excursion in the first rainy season. CEO Tony Nguyen on why that judgement is learned beside senior leads, and on Humiley's 12-month internship, which took 20+ interns in its first year.

    Read

  • Preparing for a PADR: bring the page with the red marks

    Three fan selections marked on the same line, clean-filter pressure drop where the final figure belonged, tell a PADR reviewer more than a list of projects. Humiley engineers have a PADR twice a year with a skills matrix and an Individual Improvement Plan; a repeated mark is a precise item for the next IP.

    Read

  • Inside the role: commissioning engineer

    A commissioning engineer walks each system against the drawings, starts and balances it room by room, sets the pressure cascade and closes the punch list before qualification. It is hands-on, document-heavy and the fastest way to learn how HVAC, controls and validation connect. Our 12-month internship is one way in.

    Read

  • Reading a skills matrix one row at a time

    "Verify AHU installed as per drawing" gives QA nothing to test. An IQ criterion QA can sign names each check, the document behind it and the requirement it traces to. Writing that is one row on a life-sciences engineer's skills matrix, learned by drafting real protocols and having them redlined.

    Read

  • PADR twice a year, while the work is still live

    Humiley engineers have a PADR review twice a year. At six months the project is still recognisable, so each Individual Improvement Plan can name real work, such as a cascade calculation, a FAT or a first IQ draft, and the next review can check it against what the lead engineer saw.

    Read

  • Why our HVAC engineers learn validation

    An HVAC engineer who has seen a recovery test designs the room differently. Humiley's training, designed with lead engineers from the USA, combines fundamentals, on-the-job training with senior and lead engineers, and cross-functional GMP, validation and project management, with a skills matrix and Improvement Plan for every engineer.

    Read

  • What makes an engineer senior at Humiley

    Every Humiley engineer has a skills matrix and an Individual Improvement Plan. Progression from junior to senior to lead is tied to demonstrated competence, reviewed twice a year through PADR and supported by cross-functional training in GMP, validation and project management.

    Read

  • Why we grow our own cleanroom engineers

    More than 20 interns joined Humiley's 12-month structured internship in its first year. Training designed with lead engineers from the USA covers fundamentals, on-the-job mentoring, GMP, validation and project management, with a skills matrix and improvement plan for every engineer from junior to lead.

    Read

  • Growing Together: Humiley Welcomes New Talent to Drive Engineering Excellence & Safety

    At Humiley Group INC., we believe that the foundation of every successful project—whether in the pharmaceutical, semiconductor, or renewable energy sectors—is built upon the people who design, manage, and execute it. Today, we are proud to announce the expansion of our team as we welcome a new group of talented professionals to the Humiley family.

    Read

Hiring

How our hiring works

Four steps, and we tell you where you stand at each one.

  1. Application review

    We read for what you have actually done rather than for keyword matches. A CV that says which decisions were yours, on what kind of facility, tells us far more than a list of software.

  2. Technical conversation

    A discussion about work you have done, with real follow-up questions. We are interested in how you reasoned about problems, including the ones that went wrong — every engineer has those, and the useful answer is what you changed afterwards.

  3. Meeting the team

    You meet the people you would work with and see the office. Ask them what they find frustrating; we would rather you joined with an accurate picture than a flattering one.

  4. Offer and start

    A written offer with the role, the reporting line and the terms stated plainly. Induction covers our safety protocols before anything else, on site and in the office.

Questions

Before you apply

It helps, but it is not a requirement. Strong fundamentals in your own discipline transfer well, and the regulated-environment knowledge is learnable on real projects with people who already have it. What is much harder to teach is the habit of documenting a decision as you make it.

Broadly: doing the work, then owning a package, then owning a project or a discipline. The step that takes longest is judgment about consequence — knowing which decisions are recoverable and which are not — and it is built by working on real packages under review, not by a training course.

Both, and the balance depends on the role and the project phase. Design roles are mostly office-based with site visits at key stages; commissioning and site management roles are predominantly on site. We are explicit about the split before you accept an offer.

Permits, method statements and task risk assessments are written for the job in front of us rather than copied forward, and every person on site — ours or a contractor's — is able to stop work that is not safe without justifying it first. That applies from your first day.

Yes. Openings are driven by project awards, and this list often lags behind the roles we actually need to fill. Send a CV and a short note about the work you want to be doing, and we will tell you honestly whether and when something is likely.