Remote monitoring for a GMP maintenance contract

A maintenance contractor's remote view should be read-only, with setpoints changed only under the site's change control. Its alerts watch the plant behind the room, such as fan speed, filter pressure drop and chilled water temperature, and the escalation path to site is written before the contract starts.

InsightRead

A single PM compliance percentage hides the overdue task QA cares about. Track PM compliance by criticality, overdue critical tasks listed by name, repeat failures on the same asset, and mean time to restore the pressure cascade from the BMS trend. All four need a CMMS asset register with criticality assessed.

InsightRead

Where a desiccant rotor loses its capacity

Desiccant rotors lose capacity slowly: worn sector seals let wet air cross over, a slipping drive slows the rotor, dust and solvent vapour foul the media. Measuring outlet dew point, airflow and reactivation temperature against the commissioning record shows the trend before a −60 °C dry room does.

InsightRead

Critical spares sit for years before use. Store filters upright in their cartons and issue the oldest first, turn spare motor shafts at the manufacturer's interval, track shelf life on belts and seals, keep electronics dry in anti-static packaging, and label each item with the asset it fits.

InsightRead

Installing terminal HEPA filters: the sequence

A terminal HEPA filter passes its factory test and is then carried through a building site. Clean the room and run on pre-filters first, unpack at the point of use, check the label against the position schedule, tighten evenly, then leak-scan the installed filter to ISO 14644-3 and record the serial number against its position.

InsightRead

A work order closed with ticks holds no data. Rewrite each 'check' as a named measurement with its acceptable range and the action to take outside it, and record the as-found value before any adjustment. Start with the assets the criticality assessment ranks highest. The as-found figures become the trend.