EN 1822-4:2009, since replaced by EN ISO 29463-4, allowed a HEPA filter to be repaired and retested: all repairs together, whoever made them, up to 0.5% of the face area, none longer than 3.0 cm, unless buyer and seller agreed otherwise. Most purchase orders are silent. State whether repairs are accepted and have each one marked on the scan report.
A deviation closed as human error with retraining tends to return, because what made the slip easy is still there. The 2013 text of EU GMP Chapter 1 says human error as a cause should be justified, with system causes not overlooked. Change the form, the label or the step, then check for recurrence.
WHO's technology transfer guideline (TRS 1044, Annex 4, 2022) starts before any document moves: due diligence and a gap analysis at both sites, responsibilities defined in writing, equipment compared side by side, analytical procedures transferred with the product, and acceptance criteria documented a priori. Each of these is a "should".
A SKU is one uniquely identified sellable item: a product in one strength, dosage form, pack size and pack type for one market. One tablet in two strengths, four pack sizes and five markets is 40 SKUs. It is a commercial term, yet each SKU has to match what is registered.
A mechanical engineer can catch electrical problems on the single-line diagram: a fault level at each board, breaker and busbar ratings at or above it, generator-backed loads on their own section, harmonic loads and filters marked, earthing and metering shown. The short-circuit study still does the proving.
Five times the batch at the same set-points gives different granules, because some parameters depend on scale. WHO's technology transfer guideline says batch sizes should be compared and the impact assessed where they differ. Compare the equipment, check dust, exhaust and water at the new scale, and settle set-points with trial batches.
The 2015 text of EU GMP Annex 15 allows a worst-case product approach to cleaning validation if a scientific rationale is provided; criteria may include solubility, cleanability, toxicity and potency. Put them in a table per product, with the PDE and the residue load, and reopen it when a new product arrives.
A stored value of 22.4 means nothing without its sensor tag, unit, time stamp, status flag, author and audit trail. The MHRA's 2018 data integrity guidance defines metadata as data that describe the attributes of other data and provide context and meaning. Test that backups, exports and migrations carry them.
At 0.45 m/s across a 1 m clean zone the Reynolds number is about 30,000, far beyond laminar flow. ISO 14644-1 and the 2022 EU GMP Annex 1 use the term unidirectional airflow: steady velocity, roughly parallel streams. It is tested by air speed, uniformity and smoke studies, so write it that way in the URS.
ICH Q10 describes two management reviews. Section 3.2.4 covers process performance and product quality over the lifecycle; section 4.1 covers the pharmaceutical quality system itself, its objectives and its performance indicators. Deviations on a line belong in the first, the time taken to close deviations in the second.
Outlet dew point is the last thing to check on a new desiccant dehumidifier. First confirm rotor direction, speed and seals, set and measure the process and reactivation airflows, and prove the heater and rotor interlocks. Then set the reactivation temperature and compare inlet and outlet dew point with the selection.
Long-term stability storage for hot, very humid markets is 30 °C ± 2 °C and 75% RH ± 5% RH, Climatic Zone IVb. The ASEAN guideline accepts short door-opening spikes; excursions over 24 hours should be described in the study report. The chamber's mapping and alarm history become part of the stability evidence.