Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

Announcements and company updates, alongside the technical notes our engineers publish from each practice.

Periodic evaluation is a review, not a rerun

EU GMP Annex 11 periodic evaluation asks whether a computerized system is still valid and compliant. Most of the evidence already exists in change control, deviation and incident records and the upgrade history. Review first, then retest only the functions the review shows are affected.

InsightRead

Remote monitoring for a GMP maintenance contract

A maintenance contractor's remote view should be read-only, with setpoints changed only under the site's change control. Its alerts watch the plant behind the room, such as fan speed, filter pressure drop and chilled water temperature, and the escalation path to site is written before the contract starts.

InsightRead

Sink or bubble: when product and operator both need protecting

In a live-organism suite, GMP pushes air out of the clean room while biosafety pulls it into the room holding the organism. A sink airlock below both neighbours or a bubble above them carries the compromise, and both depend on the door interlock. Each step still needs a measurable differential.

InsightRead

VFI or VI: choosing a UPS for GMP data loads

IEC 62040-3 classes UPS by how much supply disturbance reaches the load. Double-conversion VFI units keep motor-start sags, feeder transfers and generator hunting away from EMS servers and controllers; line-interactive VI units pass some through. The cost is losses, and eco mode quietly lowers the class.

InsightRead

The trace matrix gap only a backward read finds

A recovery test with a 20-minute limit, traced to a 15-minute URS requirement, passes and leaves the requirement unproven. Reading a trace matrix from each test back to its requirement finds these weak links and orphan tests. Pick three signed results at random and trace them back.

InsightRead