Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

Announcements and company updates, alongside the technical notes our engineers publish from each practice.

Trace the EMS supply from sensor to historian

A particle counter on UPS can stay powered through a power dip and count nothing if its vacuum pump sits on the normal supply. Network switches in risers, transmitters on AHU field panels and unsynchronised clocks leave the same kind of gap. Trace the supply of every item between the sensor and the historian.

InsightRead

An SOP register answers the change-control question

An SOP register should record, for each SOP, the owner, version, review date and every document it refers to. Humiley's template covers 536 SOPs across 20 departments. The cross-reference column tells a change control which documents a revision touches, and review dates keep superseded versions out of use.

InsightRead

EU GMP Annex 15 (2015) lists seven elements a validation master plan should cover. The summary of facilities and systems with their qualification status is the one inspectors use: last qualification, next requalification and open deviations, in one table rather than a paragraph of intent.

InsightRead

Material transfer into Grade A: three routes compared

On a fill-finish line, a double-door autoclave sterilises through the wrapping, a VHP pass-through decontaminates only the surfaces the vapour reaches, and a rapid transfer port docks pre-sterilised items straight into the isolator or RABS. Choose each item's route by what it tolerates, and put every route in the CCS.

InsightRead