Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

Announcements and company updates, alongside the technical notes our engineers publish from each practice.

Contractor self-commissioning is cheaper but lacks distance; an independent commissioning agent costs a fee and works for the owner. QA needs independence only on the results it will rely on: pressure cascade, air change rates, HEPA leak tests, alarms and interlocks. The rest can be self-commissioned and spot-checked.

InsightRead

One HEPA, one test report, one ceiling position

Under EN 1822, every filter from H13 upwards is tested individually and ships with its own report. At receiving, match class, serial number, rated airflow and result on label and report, then record each serial against its ceiling position in the IQ so a later leak-test failure can be traced to its lot.

InsightRead

What a printed EMS trend leaves out

FDA's 2018 data integrity Q&A separates static records from dynamic ones. A printed EMS trend keeps one view and leaves raw values, metadata and the audit trail behind. Keep the electronic original for the retention period, have the reviewer work in the system, and label printouts as convenience copies.

InsightRead

A dead sensor must look dead

Under NAMUR NE 43, a 4–20 mA loop is valid between 3.8 and 20.5 mA; 3.6 mA or below, or 21 mA or above, signals a fault. Configure the EMS to show those as bad quality and alarm, never the last good value, and detect stale values on digital links too.

InsightRead

Infrastructure qualification under a GMP SCADA

Servers, network, virtualisation, backup and time sync under a GMP system are qualified as a controlled platform; the application on top is validated for its intended use. With the platform qualified, a routine OS patch needs an impact assessment and a targeted check, not a new OQ of the SCADA.

InsightRead

Cell culture suites: the process sets the grade

In cell and gene therapy, an open step needs Grade A air, usually in a Grade B background with the gowning and air volumes that come with it. A proven closed process can justify a lower background grade. Map every step that opens the product before fixing room grades and HVAC size.

InsightRead